Materials Prepare
We design all handles and machine case shapes, and the electric inner parts, then assemly them, and then test and oldring for over 48 hours.
Taille de l’usine | 3,000-5,000 square meters |
Lieu de l’usine | 6st Floor, Fenyang East 7th Xiang, NO.11 ,Baiyun lake street, Baiyun District, Guangzhou City,Guangdong Province, China |
Nbre de lignes de production | 6 |
Fabrication sous contrat | OEM Service Offered, Design Service Offered |
Valeur de la production annuelle | US$2.5 Million - US$5 Million |